Route Selection Report: 2006 GCOB Option Report (A.5.4) Figures
Figure 1.1 2006 GCOB Route Option Plan Layout
Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints – Habitats (Sheet 1 of 2)
Figure 3.2.2 2006 GCOB Route Option with Ecology Constraints – Habitats (Sheet 2 of 2)
Figure 3.2.3 2006 GCOB Route Option with Ecology Constraints – Bat Species (Sheet 1 of 2)
Figure 3.2.4 2006 GCOB Route Option with Ecology Constraints – Bat Species (Sheet 2 of 2)
Figure 3.2.5 2006 GCOB Route Option with Ecology Constraints – Other Species (Sheet 1 of 2)
Figure 3.2.6 2006 GCOB Route Option with Ecology Constraints – Other Species (Sheet 2 of 2)
Figure 3.2.7 2006 GCOB Route Option with Annex I Habitats at Lough Corrib cSAC crossing
Figure 3.3.1 2006 GCOB Route Option with Soils and Geology Constraints (Sheet 1 of 2)
Figure 3.3.2 2006 GCOB Route Option_Soils and Geology Constraints (Sheet 2 of 2)
Figure 3.3.3 2006 GCOB Route Option with Solid Geology (Sheet 1 of 2)
Figure 3.3.4 2006 GCOB Route Option with Solid Geology (Sheet 2 of 2)
Figure 3.3.5 2006 GCOB Route Option with Soils Map (Sheet 1 of 2)
Figure 3.3.6 2006 GCOB Route Option with Soils Map (Sheet 2 of 2)
Figure 3.3.7 2006 GCOB Route Option with Subsoils Map (Sheet 1 of 2)
Figure 3.3.8 2006 GCOB Route Option with Subsoils Map (Sheet 2 of 2)
Figure 3.3.9 2006 GCOB Route Option with Soft Compresible Ground (Sheet 1 of 2)
Figure 3.3.10 2006 GCOB Route Option with Soft Compressible Ground (Sheet 2 of 2)
Figure 3.3.11 2006 GCOB Route Option with Principal Cuts and Embankments (Sheet 1 of 2)
Figure 3.3.12 2006 GCOB Route Option with Principal Cuts and Embankments (Sheet 2 of 2)
Figure 3.4.1 2006 GCOB Route Option with Hydrogeology Constraints (Sheet 1 of 2)
Figure 3.4.2 2006 GCOB Route Option with Hydrogeology Constraints (Sheet 2 of 2)
Figure 3.5.1 2006 GCOB Route Option with Hydrology Catchments (Sheet 1 of 2)
Figure 3.5.2 2006 GCOB Route Option with Hydrology Catchments (Sheet 2 of 2)
Figure 3.5.3 2006 GCOB Route Option with Flood Risk Mapping Pluvial&Groundwater (Sheet 1 of 2)
Figure 3.5.4 2006 GCOB Route Option with Flood Risk Mapping Pluvial&Groundwater (Sheet 2 of 2)
Figure 3.5.5 2006 GCOB Route Option with Flood Risk Mapping-Fluvial & Coastal (Sheet 1 of 2)
Figure 3.5.6 2006 GCOB Route Option with Flood Risk Mapping-Fluvial & Coastal (Sheet 2 of 2)
Figure 3.6.1 GCOB with Landscape and Visual features (Sheet 1 of 2)
Figure 3.6.2 GCOB with Landscape and Visual features (Sheet 2 of 2)
Figure 3.7.1 2006 GCOB Archeo._Architec. Cultural Heritage (Sheet 1 of 4)
Figure 3.7.2 2006 GCOB Archeo._Architec. Cultural Heritage (Sheet 2 of 4)
Figure 3.7.3 2006 GCOB Archeo._Architec. Cultural Heritage (Sheet 3 of 4)
Figure 3.7.4 2006 GCOB Archeo._Architec. Cultural Heritage (Sheet 4 of 4)
Figure 3.8.1 2006 GCOB Route Option with Material Assets – Agricultural Constraints
Figure 3.8.2 2006 GCOB Route Option with Material Assets – Agricultural Constraints
Figure 3.9.1 2006 GCOB with Material Assets Non Agri Property Impacts (Sheet 1 of 2)
Figure 3.9.2 2006 GCOB with Material Assets Non Agri Property Impacts (Sheet 2 of 2)
Figure 3.9.3 2006 GCOB Material Assets Non-Agricultural-Bord Gáis_ESB_SSE (Sheet 1 of 2)
Figure 3.9.4 2006 GCOB Material Assets Non-Agricultural-Bord Gáis_ESB_SSE (Sheet 2 of 2
Figure 3.10.1 2006 GCOB Route Option with Air Constraints (Sheet 1 of 2)
Figure 3.10.2 2006 GCOB Route Option with Air Constraints (Sheet 2 of 2)
Figure 3.11.1 2006 GCOB Route Option with Noise Constraints (Sheet 1 of 2)
Figure 3.11.2 2006 GCOB Route Option with Noise Constraints (Sheet 2 of 2)
Figure 3.12.1 2006 GCOB Route Option with Human Being Constraints (Sheet 1 of 2)
Figure 3.12.2 2006 GCOB Route Option with Human Being Constraints (Sheet 2 of 2)