Volume 3A – Appendices Part 1
Volume 3A _ Appendix Part 1 Table of Contents A.2.1 Phase 1 Preliminary Appraisal A.3.1 Traffic Modelling Report A.3.1 Traffic Modelling Report …
Volume 3A _ Appendix Part 1 Table of Contents A.2.1 Phase 1 Preliminary Appraisal A.3.1 Traffic Modelling Report A.3.1 Traffic Modelling Report …
Volume 3B – Appendix Table of Contents A.4.1 Public Consultation No. 1_I2 A.4.2 Ecological Constraints Report – Appendix A A.4.2 Ecological Constraints …
Volume 3C – Appendix Part 3 Table of Contents A.5.1 Lough Corrib Route Options A.5.2 Coastal Route Options Report A.5.3 On-line Report …
Figure 1.1 2006 GCOB Route Option_Plan Layout Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints _ Habitats_Sheet 1of2 Figure 3.2.2 2006 …
Figure 1.1_Cyan Route Option_Plan Layout Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1of 2) Figure 3.2.2 Cyan Route …
Volume 3D – Appendix Part 4 Table of Contents A.7.1 Green2 – Blue2 Switch Route Option Report_I2 A.7.1 Green2 – Blue2 Switch …
Figure 7.1 Sheet 1 of 2 Figure 7.2 Sheet 2 of 2
In the current project programme the planning application documents (Environmental Impact Statement and Compulsory Purchase Order) will be ready for publication by …
Following feedback received from landowner meetings, submissions received and further assessment the design option to be progressed for the Ballindooley, Castlegar and …
Please find the following link to a drawing showing the latest design from the R336 Coast Road to the N59 Moycullen Road: …
Following feedback received from landowner meetings and submissions received, the design option to be progressed from Ballymoneen Road to N59 Moycullen Road …
Following feedback received from landowner meetings, submissions received and further assessment the design option to be progressed from Na Foraí Maola to …
Two alternative design options have been developed for the Ballindooley, Castlegar and Ballybrit areas following feedback received during the public consultation sessions, …
Two alternative design options have been developed for the Ballymoneen Road to the N59 Moycullen Road area following feedback received during the …
Three alternative design options have been developed in the Cappagh area following feedback received during the public consultation sessions, landowner meetings and …
Volume 3B – Appendices Part 2 – Table of Contents A.5.1 Lough Corrib Route Options A.5.2 Coastal Route Options Report A.5.3 On-line …
Volume 3A – Appendices Part 1 – Table of Contents A.2.1 Phase 1 Preliminary Appraisal A.3.1 Traffic Modelling Report A.3.1 Traffic Modelling …
Route Selection Report – Part 1 Issue 1 Route Selection Report – Part 2 Issue 1
Volume 2 Figures – Table of Contents Route Selection Report: Chapter 3 Figures Route Selection Report: Chapter 4 Figures Route Selection Report: …
Figure 3.2.6 AADT Locations – Red Option Figure 3.2.7 AADT Locations – Orange Option Figure 3.2.8 AADT Locations – Yellow Option Figure …
Figure 4.1 Overall Key Plan and Constraints Study Area Figure 4.3.1 Designated Sites for Nature Conservation (Sheet 1 of 2) Figure 4.3.2 …
Figure 5.3.1.1 to 5.3.1.3 1st Environmental Workshop Record Figure 5.3.2 Option Development Zones Figure 5.3.3 2006 GCOB with Habitat Mapping Figure 5.3.4.1 …
Figure 6.1.1 Stage 1 Route Options_Plan Layout Figure 6.1.2 Stage 1 Route Options Schematic Figure 6.3.1.0 Stage 1 Online Option Red Corridor_Plan …
Figure 7.1.1 Stage 2 Route Options_Plan Layout Figure 7.1.2 Stage 2 Route Options_Schematic Figure 7.1.3 Stage 2 Route Options_Green-Blue Switch Figure 7.2.1.1 …
Figure 1.1 2006 GCOB Route Option Plan Layout Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints – Habitats (Sheet 1 of …
Figure 1.1 Cyan Route Option_Plan Layout Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1 of 2) Figure 3.2.2 …
Three alternative design options have been developed in the Trusky West to Aille area following feedback received during the public consultation sessions, …
Six alternative design options have been developed in the Na Foraí Maola and Trusky West area following feedback received during the public …
The Route Selection Report is being finalised and will be published in the coming weeks. Phase 3: Design has commenced. Once a …
The deadline for submissions in relation to Public Consultation No.3 for the N6 Galway City Transport Project is the 12th of June …