Appendix 7.1 Green2 – Blue2 Switch Route Option Report Figures
Figure 1.1 Green2 – Blue2 Switch Plan Layout
Figure 3.2.1 Green2- Blue2 Switch with Ecology Constraints Habitats (Sheet 1 of 2)
Figure 3.2.2 Green2 -Blue2 Switch with Ecology Constraints Habitats (Sheet 2 of 2)
Figure 3.2.3 Green2 – Blue2 Switch with Ecology Constraints Bat Species(Sheet 1 of 2)
Figure 3.2.4 Green2 – Blue2 Switch with Ecology Constraints Bat Species(Sheet 2 of 2)
Figure 3.2.5 Green2 – Blue2 Switch with Ecology Constraints Other Species (Sheet 1 of 2)
Figure 3.2.6 Green2 – Blue2 Switch with Ecology Constraints Other Species (Sheet 2 of 2)
Figure 3.2.7 Green2 – Blue2Switch with Annex I Habitats at Lough Corrib cSAC
Figure 3.3.1 Green2 – Blue2 Switch with Soils & Geology Constraints (Sheet 1 of 2)
Figure 3.3.2 Green2 – Blue2 Switch with Soils & Geology Constraints (Sheet 2 of 2)
Figure 3.3.3 Green2 – Blue2 Switch with Solid Geology (Sheet 1 of 2)
Figure 3.3.4 Green2 – Blue2 Switch with Solid Geology (Sheet 2 of 2)
Figure 3.3.5 Green2 – Blue2 Switch with Soils Map (Sheet 1 of 2)
Figure 3.3.6 Green2 – Blue2 Switch with Soils Map (Sheet 2 of 2)
Figure 3.3.7 Green2 – Blue2 Switch with Subsoils Map (Sheet 1 of 2)
Figure 3.3.8 Green2 – Blue2 Switch with Subsoils Map (Sheet 2 of 2)
Figure 3.3.9 Green2 – Blue2 Switch with Soft Compressible Ground (Sheet 1 of 2)
Figure 3.3.10 Green2 – Blue2 Switch with Soft Compressible Ground (Sheet 2 of 2)
Figure 3.3.11 Green2 -Blue2 Switch with Principal Cuttings & Embankment (Sheet 1 of 2)
Figure 3.3.12 Green2 – Blue2 Switch with Principal Cuttings & Embankment (Sheet 2 of 2)
Figure 3.4.1 Green2 – Blue2 Switch with Hydrogeology Constraints (Sheet 1 of 2)
Figure 3.4.2 Green2 – Blue2 Switch with Hydrogeology Constraints (Sheet 2 of 2)
Figure 3.5.1 Green2 – Blue2 Switch with Hydrology Constraints (Sheet 1 of 2)
Figure 3.5.2 Green2 – Blue2 Switch with Hydrology Constraints (Sheet 2 of 2)
Figure 3.5.3 Green2 – Blue2 Switch Flood Risk Map Pluvial & Groundwater (Sheet 1 of 2)
Figure 3.5.4 Green2 – Blue2 Switch Flood Risk Map Pluvial & Groundwater (Sheet 2 of 2)
Figure 3.5.5 Green2 – Blue2 Switch with Flood Risk Map Fluvial & Coast(Sheet 1 of 2)
Figure 3.5.6 Green2 – Blue2 Switch with Flood Risk Map Fluvial & Coast(Sheet 2 of 2)
Figure 3.6.1 Green2 – Blue2 Switch with Landscape and Visual Feat (Sheet 1 of 2)
Figure 3.6.2 Green2 – Blue2 Switch with Landscape and Visual Feat (Sheet 2 of 2)
Figure 3.8.1 Green2 -Blue2 Switch with Material Assets Agricultural Constraints (Sheet 1 of 2)
Figure 3.8.2 Green2 -Blue2 Switch with Material Assets Agricultural Constraints (Sheet 2 of 2)
Figure 3.9.1 Green2 -Blue2 Switch with Material Assets Non Agricultural Impact (Sheet 1 of 2)
Figure 3.9.2 Green2 – Blue2 Switch with Material Assets Non Agricultural Impacts (Sheet 2 of 2)
Figure 3.9.3 Green – Blue Switch with Bord Gáis ESB SSE (Sheet 1 of 2)
Figure 3.9.3 Green2 – Blue2 Switch Matrl Assets Non Agricultural BGas ESB SSE(Sheet 1 of 2)
Figure 3.9.4 Green – Blue Switch with Bord Gáis ESB SSE (Sheet 2 of 2)
Figure 3.9.4 Green2 – Blue2 Switch Matrl Assets Non Agricultural BGas ESB SSE (Sheet 2 of 2)
Figure 3.10.1 Green2 – Blue2 Switch with Air Constraints (Sheet 1 of 2)
Figure 3.10.2 Green2 – Blue2 Switch with Air Constraints (Sheet 2 of 2)
Figure 3.11.1 Green2 – Blue2 Switch with Noise Constraints (Sheet 1 of 2)
Figure 3.11.2 Green2 – Blue2 Switch with Noise Constraints (Sheet 2 of 2)
Figure 3.12.1 Green2 – Blue2 Switch with Human Being Constraints(Sheet 1 of 2)
Figure 3.12.2 Green2 – Blue2 Switch with Human Being Constraints(Sheet 2 of 2)