Appendix 5.4 2006 GCOB Figures
Figure 1.1 2006 GCOB Route Option_Plan Layout
Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints _ Habitats_Sheet 1of2
Figure 3.2.2 2006 GCOB Route Option with Ecology Constraints _ Habitats_Sheet 2of2
Figure 3.2.3 2006 GCOB Route Option with Ecology Constraints _ Bat Species_Sheet 1of2
Figure 3.2.4 2006 GCOB Route Option with Ecology Constraints _ Bat Species_Sheet 2of2
Figure 3.2.5 2006 GCOB Route Option with Ecology Constraints _ Other Species_Sheet 1of2
Figure 3.2.6 2006 GCOB Route Option with Ecology Constraints _ Other Species_Sheet 2of2
Figure 3.2.7 2006 GCOB Route Option with Annex I Habitats at Lough Corrib cSAC crossing
Figure 3.3.1_2006 GCOB Route Option with Soils and Geology Constraints Sheet 1 of 2
Figure 3.3.2_2006 GCOB Route Option_Soils and Geology Constraints Sheet 2 of 2
Figure 3.3.3_2006 GCOB Route Option with Solid Geology (Sheet 1 of 2)
Figure 3.3.4_2006 GCOB Route Option with Solid Geology (Sheet 2 of 2)
Figure 3.3.5_2006 GCOB Route Option with Soils Map (Sheet 1 of2)
Figure 3.3.6_2006 GCOB Route Option with Soils Map (Sheet 2 of2)
Figure 3.3.7_2006 GCOB Route Option with Subsoils Map (Sheet 1 of2)
Figure 3.3.8_2006 GCOB Route Option with Subsoils Map (Sheet 2 of2)
Figure 3.3.9_2006 GCOB Route Option with Soft Compresible Ground (Sheet 1 of2)
Figure 3.3.10_2006 GCOB Route Option with Soft Compressible Ground (Sheet 2 of2)
Figure 3.3.11_2006 GCOB Route Option with Principal Cuts and Embankments (Sheet 1of 2)
Figure 3.3.12_2006 GCOB Route Option with Principal Cuts and Embankments (Sheet 2of 2)
Figure 3.4.1_2006 GCOB Route Option with Hydrogeology Constraints (Sheet1of2)
Figure 3.4.2_2006 GCOB Route Option with Hydrogeology Constraints (Sheet2of2)
Figure 3.5.1 2006 GCOB Route Option with Hydrology Catchments(Sheet1of2)
Figure 3.5.2 2006 GCOB Route Option with Hydrology Catchments(Sheet2of2)
Figure 3.5.3 2006 GCOB Route Option with Flood Risk Mapping-Pluvial&Groundwater(Sheet1)
Figure 3.5.4 2006 GCOB Route Option with Flood Risk Mapping-Pluvial&Groundwater(Sheet2)
Figure 3.5.5 2006 GCOB Route Option with Flood Risk Mapping-Fluvial & Coastal(Sheet1of2)
Figure 3.5.6 2006 GCOB Route Option with Flood Risk Mapping-Fluvial & Coastal(Sheet2of2)
Figure 3.6.1 _2006 GCOB with Landscape and Visual features (Sheet 1 of 2)
Figure 3.6.2 _2006 GCOB with Landscape and Visual features (Sheet 2 of 2)
Figure 3.7.1 2006 GCOB Archeo_Architec_Cultural Heritage (Sheet 1 of 4)
Figure 3.7.2 2006 GCOB Archeo_Architec_Cultural Heritage (Sheet 2 of 4)
Figure 3.7.3 2006 GCOB Archeo_Architec_Cultural Heritage (Sheet 3 of 4)
Figure 3.7.4 2006 GCOB Archeo_Architec_Cultural Heritage (Sheet 4 of 4)
Figure 3.8.1_2006 GCOB Route Option with Material Assets – Agricultural Constraints
Figure 3.8.2_2006 GCOB Route Option with Material Assets – Agricultural Constraints
Figure 3.9.1 2006 GCOB with Material Assets Non Agri Property Impacts(Sheet 1 of 2)
Figure 3.9.2 2006 GCOB with Material Assets Non Agri Property Impacts(Sheet 2 of 2)
Figure 3.9.3 2006 GCOB Material Assets Non_Agricultural_Bord Gáis_ESB_SSE (Sheet 1 of 2)
Figure 3.9.3 2006 GCOB Material Assets Non_Agricultural_Bord Gáis_ESB_SSE (Sheet 1 of 2)
Figure 3.10.1_2006 GCOB Route Option with Air Constraints (Sheet 1of2)
Figure 3.10.2_2006 GCOB Route Option with Air Constraints (Sheet 2of2)
Figure 3.11.1_2006 GCOB Route Option with Noise Constraints(Sheet1of2)
Figure 3.11.2_2006 GCOB Route Option with Noise Constraints(Sheet2of2)