Phase 3

Design Update: – 26/10/2016

Individual landowner letters and drawings have been posted to all directly impacted landowners to provide an update on the project, the current …

Design Update: Menlough and Coolough area – 17/06/2016

Please find the following link to drawings showing the latest design from the River Corrib to the N84 Headford Road: http://www.n6galwaycity.ie/wp-content/uploads/2016/06/GCOB-SK-D-679-680_River_Corrib-to-N84_Current_Design2-Sheets.pdf We …