Bulletin # 20 Update – 24/04/2019
The Application for the N6 Galway City Ring Road (GCRR) was lodged with An Bord Pleanála (ABP) in October 2018. Following that, …
The Application for the N6 Galway City Ring Road (GCRR) was lodged with An Bord Pleanála (ABP) in October 2018. Following that, …
All of the submissions/objections in relation to the N6 Galway City Ring Road (GCRR) Scheme have now been received by Galway County …
The Environmental Impact Assessment Report and Natura Impact Statement for the N6 Galway City Ring Road (GCRR) have been submitted to An …
The Environmental Impact Assessment Report and Natura Impact Statement for the N6 Galway City Ring Road (GCRR) have been submitted to An …
The planning application for the N6 Galway City Ring Road (GCRR) has been finalised and will be submitted to An Bord Pleanála …
The current design for the N6 Galway City Ring Road, including the proposed development boundary, can be found at the following links: …
The final meeting with An Bord Pleanála, as part of the pre-application consultation process, took place in the last month. The planning …
A final meeting with An Bord Pleanála to close out the consultation process with them is expected within the coming weeks. The …
The Galway Transport Strategy (GTS), which aims to deliver an overall transport solution for Galway and environs, is being advanced by Galway …
Individual landowner letters and drawings have been posted to all directly impacted landowners to provide an update on the project, the current …
Figure 1.1 Green2 – Blue2 Switch Plan Layout Figure 3.2.1 Green2- Blue2 Switch with Ecology Constraints Habitats (Sheet 1 of 2) Figure 3.2.2 …
Volume 3A – Appendices Part 1 Volume 3B – Appendices Part 2 Volume 3C – Appendices Part 3 Volume 3D – Appendices …
Volume 3A _ Appendix Part 1 Table of Contents A.2.1 Phase 1 Preliminary Appraisal A.3.1 Traffic Modelling Report A.3.1 Traffic Modelling Report …
Volume 3B – Appendix Table of Contents A.4.1 Public Consultation No. 1_I2 A.4.2 Ecological Constraints Report – Appendix A A.4.2 Ecological Constraints …
Volume 3C – Appendix Part 3 Table of Contents A.5.1 Lough Corrib Route Options A.5.2 Coastal Route Options Report A.5.3 On-line Report …
Figure 1.1 2006 GCOB Route Option_Plan Layout Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints _ Habitats_Sheet 1of2 Figure 3.2.2 2006 …
Figure 1.1_Cyan Route Option_Plan Layout Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1of 2) Figure 3.2.2 Cyan Route …
Volume 3D – Appendix Part 4 Table of Contents A.7.1 Green2 – Blue2 Switch Route Option Report_I2 A.7.1 Green2 – Blue2 Switch …
Figure 7.1 Sheet 1 of 2 Figure 7.2 Sheet 2 of 2
Two alternative design options have been developed for the Ballymoneen Road to the N59 Moycullen Road area following feedback received during the …
This Route Selection Report presents the findings of the Constraints and Route Selection study for the proposed N6 Galway City Transport Project …
Route Selection Report – Part 1 Issue 1 Route Selection Report – Part 2 Issue 1
Volume 2 Figures – Table of Contents Route Selection Report: Chapter 3 Figures Route Selection Report: Chapter 4 Figures Route Selection Report: …
Figure 3.2.6 AADT Locations – Red Option Figure 3.2.7 AADT Locations – Orange Option Figure 3.2.8 AADT Locations – Yellow Option Figure …
Figure 4.1 Overall Key Plan and Constraints Study Area Figure 4.3.1 Designated Sites for Nature Conservation (Sheet 1 of 2) Figure 4.3.2 …
Figure 5.3.1.1 to 5.3.1.3 1st Environmental Workshop Record Figure 5.3.2 Option Development Zones Figure 5.3.3 2006 GCOB with Habitat Mapping Figure 5.3.4.1 …
Figure 6.1.1 Stage 1 Route Options_Plan Layout Figure 6.1.2 Stage 1 Route Options Schematic Figure 6.3.1.0 Stage 1 Online Option Red Corridor_Plan …
Figure 7.1.1 Stage 2 Route Options_Plan Layout Figure 7.1.2 Stage 2 Route Options_Schematic Figure 7.1.3 Stage 2 Route Options_Green-Blue Switch Figure 7.2.1.1 …
Figure 1.1 2006 GCOB Route Option Plan Layout Figure 3.2.1 2006 GCOB Route Option with Ecology Constraints – Habitats (Sheet 1 of …
Figure 1.1 Cyan Route Option_Plan Layout Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1 of 2) Figure 3.2.2 …