Route Selection Report: Cyan Route Option Report (A.5.5) Figures
Figure 1.1 Cyan Route Option_Plan Layout
Figure 3.2.1 Cyan Route Option with Ecology Constraints – Habitats (Sheet 1 of 2)
Figure 3.2.2 Cyan Route Option with Ecology Constraints – Habitats (Sheet 2 of 2)
Figure 3.2.3 Cyan Route Option with Ecology Constraints – Bat Species (Sheet 1 of 2)
Figure 3.2.4 Cyan Route Option with Ecology Constraints – Bat Species (Sheet 2 of 2)
Figure 3.2.5 Cyan Route Option with Ecology Constraints – Other Species (Sheet 1 of 2)
Figure 3.2.6 Cyan Route Option with Ecology Constraints – Other Species (Sheet 2 of 2)
Figure 3.2.7 Cyan Route Option with Annex I Habitats at Lough Corrib cSAC crossing
Figure 3.3.1 Cyan Route Option with Soils and Geology Constraints (Sheet 1 of 2)
Figure 3.3.2 Cyan Route Option_Soils and Geology Constraints (Sheet 2 of 2)
Figure 3.3.3 Cyan Route Option_Soils and Geology Constraints (Sheet 1 of 2)
Figure 3.3.4 Cyan Route Option with Solid Geology (Sheet 2 of 2)
Figure 3.3.5 Cyan Route Option with Soils Map (Sheet 1 of 2)
Figure 3.3.6 Cyan Route Option with Soils Map (Sheet 2 of 2)
Figure 3.3.7 Cyan Route Option with Subsoils Map (Sheet 1 of 2)
Figure 3.3.8 Cyan Route Option with Subsoils Map (Sheet 2 of 2)
Figure 3.3.9 Cyan Route Option with Soft Compresible Ground (Sheet 1 of 2)
Figure 3.3.10 Cyan Route Option with Soft Compressible Ground (Sheet 2 of 2)
Figure 3.3.11 Cyan Route Option with Principal Cuttings and Embankments (Sheet 1 of 2)
Figure 3.3.12 Cyan Route Option with Principal Cuttings and Embankments (Sheet 2 of 2)
Figure 3.4.1 Cyan Route Option with Hydrogeology Constraints (Sheet 1 of 2)
Figure 3.4.2 Cyan Route Option with Hydrogeology Constraints (Sheet 2 of 2)
Figure 3.5.1 Cyan Route Option with Hydrology Catchments (Sheet 1 of 2)
Figure 3.5.2 Cyan Route Option with Hydrology Catchments (Sheet 2 of 2)
Figure 3.5.3 Cyan Route Option with Flood Risk Mapping-Pluvial&Groundwater (Sheet 1 of 2)
Figure 3.5.4 Cyan Route Option with Flood Risk Mapping-Pluvial&Groundwater (Sheet 2 of 2)
Figure 3.5.5 Cyan Route Option with Flood Risk Mapping -Fluvial & Coastal (Sheet 1 of 2)
Figure 3.5.6 Cyan Route Option with Flood Risk Mapping -Fluvial & Coastal (Sheet 2 of 2)
Figure 3.6.1 Cyan Route Option with Landscape and Visual features (Sheet 1 of 2)
Figure 3.6.2 Cyan Route Option with Landscape and Visual features (Sheet 2 of 2)
Figure 3.7.1 Cyan Archeo._Architec._Cultural Heritage (Sheet 1 of 4)
Figure 3.7.2 Cyan Archeo._Architec._Cultural Heritage (Sheet 2 of 4)
Figure 3.7.3 Cyan Archeo._Architec._Cultural Heritage (Sheet 3 of 4)
Figure 3.7.4 Cyan Archeo._Architec._Cultural Heritage (Sheet 4 of 4)
Figure 3.8.1 Cyan Route Option with Material Assets-Agri Constraints (Sheet 1 of 2)
Figure 3.8.2 Cyan Route Option with Material Assets -Agri Constraints (Sheet 2 of 2)
Figure 3.9.1 Cyan Route Option with Material Assets Non Agri Property Impacts (Sheet 1 of 2)
Figure 3.9.2 Cyan Route Option with Material Assets Non Agri Property Impacts (Sheet 2 of 2)
Figure 3.9.3 Cyan Material Assets Non-Agricultural-Bord Gáis_ESB_SSE (Sheet 1 of 2)
Figure 3.10.1 Cyan Route Option with Air Constraints (Sheet 1 of 2)
Figure 3.10.2 Cyan Route Option with Air Constraints (Sheet 2 of 2)
Figure 3.11.1 Cyan Route Option with Noise Constraints (Sheet 1 of 2)
Figure 3.11.2 Cyan Route Option with Noise Constraints (Sheet 2 of 2)
Figure 3.12.1 Cyan Route Option with Human Being Constraints (Sheet 1 o f2)
Figure 3.12.2 Cyan Route Option with Human Being Constraints (Sheet 2 of 2)